Truth Computing

The presubmittal layer

Catch the red lines before the city does.

We automate the presubmittal plan check to end the correction loop. Every building design is checked against the code for its jurisdiction before it goes to the city, and every issue comes back with the fix. This is Truth Computing embedded in construction: forward deployed, in the workflow, on the drawings.

Flagship In selection

PreCheck

Presubmittal Compliance Engine · V1 vertical: ADA

“We don’t find out what’s wrong until the city red lines us, weeks later.”

Upload your construction documents (PDF, drawings, or BIM). The engine checks the design against the codes for that specific jurisdiction and returns a presubmittal corrections list. A city plan checker tells you what is wrong. PreCheck tells you how to fix it, before you ever submit.

For: architects and designers, and the developer PM offices who carry the cost of every cycle.

  • IBC
  • CBC
  • CRC
  • Title 24
  • ADA
  • CALGreen

How it works

  1. Upload
    Drop in your CDs: PDF, drawings, or BIM.
  2. Check
    We run the design against the codes for that jurisdiction.
  3. Fix it list
    Get a corrections list with how to resolve each issue, before you submit.

The suite

A deliberately sequenced set of tools, all sitting in the presubmittal layer. Each removes one reason a project gets stuck in plan check.

CodeBase

Inland Empire Jurisdiction Code Library
Planned

“The code library everyone uses has no real Inland Empire coverage, so we hire consultants.”

Deep, maintained code pages for Riverside, San Bernardino, Fontana, Ontario, Eastvale, Chino, and Tracy, including the local amendments and infrastructure sequencing rules generic libraries don’t document.

For anyone doing code research for IE projects.

RedLine IQ

Correction Intelligence · the data moat
Planned

“Cities enforce changes that aren’t published anywhere until you get dinged for them.”

Every correction your team uploads trains the engine and surfaces unwritten or newly enforced code changes, so the next project does not lose a cycle to the same surprise. The system gets sharper each time a city sends something back.

For repeat submitters who feel the same rejections twice.

FastLane

Completeness & Express/OTC Qualifier
Planned

“We never know if we’ll land in the fast pile or the slow pile.”

Checks submittal completeness against the jurisdiction’s requirements and tells you whether the package qualifies for Express or over the counter (OTC) review, and exactly what is missing if it does not.

For developers and expediters optimizing time to approval.

AHJ Map

Multi Jurisdiction Coordinator
Planned

“One project touches the building department, the fire marshal, and environmental health, and nobody reconciles them.”

Aggregates requirements from every Authority Having Jurisdiction on a project into one view. Conflicts and overlaps surface before submission, not after.

For complex, multi AHJ projects.

CarryClock

Carrying Cost ROI
Planned

“Every week stuck in plan check is full carrying cost for nothing.”

Translates correction rounds avoided into days and dollars saved against the project’s daily carrying cost, so the value is legible to whoever signs the check.

For the economic buyer: corporate PM and finance.

One layer, sequenced on purpose: PreCheck finds the issues, CodeBase grounds them in local code, and RedLine IQ makes the whole system smarter every time a correction comes back.

Where we fit in your workflow

  1. Stage 1 Design
  2. Stage 2 Code Research
  3. Stage 3 Compliance Check ← This is us
  4. Stage 4 Permit Submission
  5. Stage 5 Tracking

We own Stage 3. We sit upstream of the tools that submit and track permits, and complement the code reference libraries used in research, by feeding clean, corrected designs into the rest of your stack rather than competing with it.

15 to 18 days
per residential plan check cycle, and multiple cycles commonly stretch to 4 to 6 months.
~29%
of manual plan checks contain errors or inconsistencies.
$10K to $50K/day
carrying costs while a mid sized IE development sits idle.

Figures are drawn from published industry research on plan review timelines and development carrying costs. They describe the sector, not results we have produced, and they are not a guarantee of outcomes.

Founding engagements. We are selecting our first design partners.

If you carry the cost of every plan check cycle, as a developer PM office, architect, or expediter, we will build PreCheck around your real submittals.

Become a design partner Or reach us directly at mtorre@truth-computing.com